Our client receives a full set of calculations, a temporary design certificate, a 2D set of detailed drawings and a 3D drawing for visualisation purposes.

  • Once the design process is complete the drawings are prepared by our drawing technician.
  • The structure is then analysed on a computer design package to ensure the proposed scaffolding members can sustain the loads allowed for. Our Chartered Engineers assess the loads on the structure (wind, live, snow etc.).
  • Once the general concept of the scaffold design is agreed the design process begins on our end.
  • This is emailed through to the relevant parties for discussion.
  • A 3D model of the scaffolding structure called a "scheme design" is sketched up by our technicians.
  • This may include a site visit to discuss the scaffolding design in question. From an initial conversation the scope of the scaffold project is written up and agreed. Our client includes scaffolding contractors, government bodies tendering a scaffold project, main contractors or other architects/engineers.
  • The client appoints as the scaffolding designer.
  • The exact method of a scaffold design varies from project to project but below is an example of how the design process is carried out: The railway line, which is on the main Dublin to Belfast route remained open during the works. The scaffolding, which was hung from the railway bridge structure, was fully encapsulted to allow for repair works to the steel frame of the deck.

    a-frame scaffolding design calculation

    The project lasted 9 months as alterations were carried out to the scaffold structure once erected. D O Sullivan Consulting Engineers acted as the design engineers for the scaffolding. Contractor Gabrial Hughes & Jons Civil Engineering. Our clients vary from both the private to public sector.īoyne Viaduct Scaffolding in Drogheda Design for Irish Rail.

    a-frame scaffolding design calculation

    We have been appointed as Scaffold Design Engineers on a wide variety of project throughout Ireland and the UK. We have build up a reputation in Ireland as a leader in Scaffold Design services through our efficiency, precise detailing on drawings and straight forward approach to design on scaffold structures. Metal tube scaffold equivalent to or less than 40 metres in height –D O Sullivan Consulting Engineers have been specialising in Scaffolding Design for the last 8 years. When you appoint D O Sullivan Consulting Engineer as your scaffolding designer you get a C hartered structural engineer who works closely with the client from the initial stages of the scheme design of the scaffolding structure right through to queries during the construction stage.All other metal tube scaffolds shall have their designs and drawings approved by the.Non-prefabricated metal tube scaffold (tube and coupler scaffold): any metal complying with other standards (other than BS 1139).

    a-frame scaffolding design calculation

  • Non-prefabricated metal tube scaffold (tube and coupler scaffold): (aluminium tubing complying with BS 1139).
  • Prefabricated metal tube scaffold: modular/system scaffold, frame scaffold.
  • Other scaffold exceeding 15 metres in height –.
  • Non-prefabricated metal tube scaffold (tube and coupler scaffold): steel tubing complying with BS 1139.
  • Metal tube scaffold exceeding 40 metres in height –.
  • #A FRAME SCAFFOLDING DESIGN CALCULATION PROFESSIONAL#

  • 75(1) Every metal tube scaffold exceeding 40 metres in height and every other scaffold exceeding 15 metres in height shall be constructed in accordance with the design and drawings of a Professional Engineer.
  • All scaffolding above 3 m in height will require a scaffolding drawing and submitted to DOSH.
  • In accordance to the Factories and Machinery Act 1967 (Act 139) and Factories and Machinery (Building Operations and Works of Engineering Construction) (Safety) Regulations 1986) (BOWEC 1986) –. ASiA Consultants has established our own procedure and systems to comply with the guidelines issued by the Department of Safety & Health (DOSH) Malaysia in 2016.